It is currently Wed Sep 08, 2010 10:44 am

All times are UTC




Post new topic Reply to topic  [ 14 posts ]  Go to page Previous  1, 2
Author Message
 Post subject: Re: Longer Build
PostPosted: Thu Mar 04, 2010 7:12 am 
Offline
Moderator
User avatar

Joined: Tue Feb 01, 2005 12:47 pm
Posts: 1902
Rocks and other features are already approved (in principle).

The last plan was to make two runs down the hill the second splitting off after the second table top and running down the hill between the existing track and the push up. This would have more corners and technical type features but still include a few jumps etc. Both track would then meet at the bottom and the continue further down the hill on the left near the old fence line.
There is a flattish area to the right of this with a small banking at the top and the idea here was to make a small skills area similar to that at Thackley with several roll ins for table top jump lines of varying sizes and and some drop offs and rock sections etc.

_________________
www.teamfatknacker.co.uk
www.singletraction.org.uk
www.crosstrax.co.uk


Top
 Profile  
 
 Post subject: Re: Longer Build
PostPosted: Thu Mar 04, 2010 1:17 pm 
Offline

Joined: Mon Mar 17, 2008 1:42 pm
Posts: 127
Location: Temple Newsam
balls. i'm moving to harrogate on Saturday. It took me nearly two years to find the trail in the first place. :(


Top
 Profile  
 
 Post subject: Re: Longer Build
PostPosted: Thu Mar 04, 2010 3:25 pm 
Offline

Joined: Tue Jan 06, 2009 7:30 pm
Posts: 120
Location: Leeds
[Ell] wrote:
thefosterkid is correct, the trail has to be 'sustainable', so has to be hard wearing and not get chewed up in wet weather.


ah right, so in theory you could build roots into it but its the you have to use a hard compound to ride on that wont wash away or go muddy basicly?


Top
 Profile  
 
 Post subject: Re: Longer Build
PostPosted: Thu Mar 04, 2010 3:27 pm 
Offline

Joined: Tue Jan 06, 2009 7:30 pm
Posts: 120
Location: Leeds
knacker wrote:
Rocks and other features are already approved (in principle).

The last plan was to make two runs down the hill the second splitting off after the second table top and running down the hill between the existing track and the push up. This would have more corners and technical type features but still include a few jumps etc. Both track would then meet at the bottom and the continue further down the hill on the left near the old fence line.
There is a flattish area to the right of this with a small banking at the top and the idea here was to make a small skills area similar to that at Thackley with several roll ins for table top jump lines of varying sizes and and some drop offs and rock sections etc.


i see, sounds like a good design.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 14 posts ]  Go to page Previous  1, 2

All times are UTC


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
Template made by DEVPPL